BM2 Installation
How should your EMBRACE mounted?

BM2 Installation
Embrace | BM2 mounts securely between floor and ceiling using tension and screws for stability.
Must be installed according to the assembly manual:
Installation time: approx. 1 hour
Adjustment time: minutes
Important installation note
The adjustment roundel must extend minimum 3 cm (30 mm) and maximum 11 cm.
We have created an easy-to-follow guide to help you create your perfect space.
Accessories for BM2:

Lova Wood Shelf Installation
Install using the included felt pads — follow the assembly manual.
Once installed, the shelf is ready to use on its own or as the base for accessories such as Vigg Felt Boxes or the Nell Metal Box.

Nell Metal Box Installation
We’ve made the setup process simple and intuitive.
Delivered flat-packed
Easy assembly — follow the included manual
Mounts directly onto the Lova Shelf

Gro Soft Pocket Installation
Mount the pocket on BM2 and attach the metal clips
Remove clips and spread the pocket before planting, following the included instructions

Vigg Felt Box Installation
We are always here to help
We have created an easy-to-follow guide to help you create your perfect space.
Flat-pack design — The Vigg Felt Box arrives flat and assembles in just a few simple steps.
Easy to fold and shape — Follow the included manual to fold the felt panels into place and secure the structure.
No tools required — The box is designed to be assembled by hand, keeping the process quick and effortless.
Fits the Lova Wood Shelf — Once assembled, simply place Vigg on your 3707 Lova Wood Shelf for an instantly organized, soft storage solution.

Alva S-Hook Installation
No installation required
Hooks directly onto Embrace modules and accessories

Are things not going as planned? We are here for you if you need help.
Call us
Send us an email
Business hours
Monday to Friday: 8.30am-4.30